Substations and compounds
On a live site, gaining access is the job which comes before the vegetation work. Escorted, permitted and recorded every time.
Working on a live electrical site:
The stone is a safety feature
A sterile compound is kept clear so faults can be seen, fire cannot carry and the earthing works as designed. Growth coming through it is a defect, not untidiness.
Statutory clearances apply to us too
Clearances around live apparatus are set by the Electricity at Work Regulations and your safety rules. Our method statement is written to them, and to your permit, before we arrive.
Unmanned sites drift
Most compounds are visited rarely. A site left for two seasons needs clearing instead of treating, at several times the cost of having kept it on a treatment programme.
One programme, hundreds of sites
Dispersed compounds visited to a schedule, each with the same record and the same evidence pack. One programme, not hundreds of separate jobs.
Where we work:
Stone compounds and sterile strips
Perimeter fences and access tracks
Invasive species on site
Hard standings and parking
A record for every visit
| Work | When | What it means |
|---|---|---|
| Programme treatment | Follow programme | Compounds treated on a planned cycle, so the stone is kept down and the site is kept from drifting towards needing clearing. |
| Reinstatement | One off | For sites left long enough that they have to be cut and cleared before a treatment programme can start at all. |
Not sure what is growing in the compound?
Use our free, instant Photo Identification app: photograph it to see what it is likely to be, how much of a risk it is where it is and what to do next. It asks first whether you are authorised to take and upload photographs of the site.
One site or the whole portfolio
Send us the site list and the access arrangements. We will build the schedule around your outage windows.